A half bolquete of debris was removed on Saturday
Without so much debris, the space looks very large…
Renovation continues
on Saturday a second large “bolquete” of debris and refuse was discarded from the apartment
The removal of plaster from the main bathroom ceiling
reveals concrete “beams”. The bathroom, ready for wall repairs to begin.
The entrance window emits much light on a sunny day.
The main bathroom ceiling after removing the “box”
Another mound of rubble is ready for removal this Saturday
Looking into the living area from a bedroom
Looking back to the kitchen from the living
Gonzalo took advantage of a long weekend without builders to use the space for a creative photography assignment.
The new vs. old electrical circuit board
Bricking up the old bathroom door entrance
Re-planning main bathroom plumbing
After removal of the old hot water system
and a Saturday’s rubble removal
Removing the tiles from the bathroom and revealing the original ceiling height
The team: Christian, Manuel, German
Looking above the second bathroom to where the existing wall will be extended to the ceiling
the walls, today
removing the decades of paint from the doors
and looking into the kitchen and out from the kitchen
and making a new doorway from bedroom to bathroom