Saturday, November 18, 2006
Friday, November 17, 2006
Nov 17 update
Here are the last photos before the place gets its final finish and clean up…
…tomorrow another bolquete will allow the removal of the last load of debris… the result of the destruction of the walls where we increased the size of several windows
Painted shutters and doors await re-hanging
the living room wall, repainted in its original colors
the kitchen walls almost totally replastered and ready for painting
touch-ups and painting in the kitchen
the wood floors, pre-sanding.
And abundant light now enters where windows have been enlarged
Soon, the cardboard on the floors will be removed, the floors polished, the final paint touch-ups carried out and….
you’ll never see this again !
Tuesday, November 14, 2006
Nov 14 update
Finishing activity…
Preparing and spraying the shutters
The pink tinted plaster for touch ups is applied where needed
the wood floors revealed, awaiting “pulido” or sanding
one of the new window frames installed, awaiting glass and the wall to be opened
fine plastering
and finishing parts of the kitchen after new plumbing is installed
Saturday, November 11, 2006
Nov 11 update
The window frames are made and installed ready for the rest of the wall to be opened to lengthen the window to floor level. Below the window, one of the shutters from the front balcony in the process of being repainted.
Window frames are being painted.
New plumbing in the kitchen awaiting rendering.
Bathroom 1 plumbing completed and walls and floor rendered.
Burglar deterrents (we hope) awaiting installation on the balcony.
And the entrance window from outside, before panelling it shut with glass.
The area where we have to work to access that window !
A scaffold-like structure will be built to access the window from the outside.
Thursday, November 2, 2006
Nov 2 update
Some views
towards the kitchen from the open loft and a closer look at the kitchen
looking into the 2nd bathroom
looking forward from the kitchen area and from the lounge area
from left side to right side of open loft and looking back to the lounges
the bathroom door gets installed and the walls rendered in cement