Saturday, November 11, 2006

Nov 11 update

The window frames are made and installed ready for the rest of the wall to be opened to lengthen the window to floor level. Below the window, one of the shutters from the front balcony in the process of being repainted.

Window frames are being painted.

New plumbing in the kitchen awaiting rendering.

Bathroom 1 plumbing completed and walls and floor rendered.

Burglar deterrents (we hope) awaiting installation on the balcony.

And the entrance window from outside, before panelling it shut with glass.

The area where we have to work to access that window !

A scaffold-like structure will be built to access the window from the outside.

 

 

Posted by Russell at 00:00:00
Comments

Comments are closed.